Differences between revisions 1 and 2
Revision 1 as of 2010-01-28 16:59:25
Size: 702
Editor: anderson-camtasia
Comment:
Revision 2 as of 2010-01-28 17:00:02
Size: 727
Editor: anderson-camtasia
Comment:
Deletions are marked like this. Additions are marked like this.
Line 6: Line 6:
 * TopPlan picture (may be a link to the filtered [[ArchaeologyProject/PhotoApplicationSpecifications|Photo Application Specifications]].  * [[HowToCreateTopPlans|Top Plan]] picture (may be a link to the filtered [[ArchaeologyProject/PhotoApplicationSpecifications|Photo Application Specifications]].

DailySquareSummary

Fields

Placement

The DailySquareSummary will be placed after the loci tabs for the square. Similar to the tabs in each loci, tabs will exist for each day with the ability to add new days of course.

Notes

As of 1/28/2010, This addition requires an addition to the database linked to each square. However this has no other square or loci database entanglements, so I'm guessing this form will take 3-6 hours to complete.

ArchaeologyProject/DailySquareSummary (last edited 2010-01-28 17:00:14 by anderson-camtasia)